Project Update February 6th, 2017: I have been pretty busy with running Vorshlag, adding content to the new website, starting a second business, and remodeling my house that is about to go on the market. So the spare time I used to use to write these build thread updates has been in short supply. Work on the 69 Camaro has been moving along at a steady pace (dictated by the owner) and I needed to catch up, a lot. While my wife was watching Superbowl 51 last night I broke out my laptop and put this together.

Lots of good work to show on the Camaro - the body went back on the chassis and it was off the fab table for good! This time we show the body going back into the frame, the dual 3" exhaust routing through the tunnel and to mufflers out back, and finally aluminum flat bottom undertray panels being built.
BODY ONTO CHASSIS, DRIVETRAIN INSTALLED
This was exciting - reunification of body and chassis! At this point the unibody was so trimmed away and light that it was really easy for 2 people to lift it. Using 4 people it could be spread apart and fit around the roll cage structure and frame rails in half a minute. Once this was tack welded to the frame rails it wasn't ever coming off the frame again - this isn't that kind of body. A composite body is usually made to be removable, but this steel unibody will need to be welded to the frame - hence the reason for painting the areas we did.

Now it was time to put the engine and transmission together for the last time before it is fired up. Now we didn't spec or supply any of the drivetrain bits outside of the innards of the ford 9", so Ryan went over every detail to double-check what was brought to us.

There are normally two dowels in the back of the block on an LS3 crate engine like this. But these had been man handled in a previous life and were mangled beyond repair, so they were removed and replaced. You don't want to forget to fix something like this after the drivetrain is assembled and back in the car.

I didn't get any close-up pictures of the clutch, but its a 5.5" triple disc setup that uses a hydraulic throw out bearing/slave cylinder and a unique bell housing for the g-force transmission. A very small diameter clutch with limited engagement range and a transmission without synchros means this is a setup best suited for track use - and little else. But those things also mean it will be light and strong.

Just a shot of the engine bay with mounts in place but the motor out (above left) then with the LS3 engine back back in there. Up to this point in the build the fabricated transmission crossmember was only tack welded together and held in with some clamps. The reason for the unusual shape of the transmission crossmember will be apparent below, when we go over exhaust routing.

Now it was time to final weld that crossmember and add the threaded bungs for it's mounting bolts to the chassis. These bungs were created from some steel round bar in the lathe - machined with a face to butt up to the tubing, threaded through a hole. Then a hole was drilled in the tubular chassis member and these were welded in place, on both sides of the tube. Now the bolts for the crossmember had somewhere to thread into. A bolt and nut would simply crush the square tubing, and welding in an anti-crush sleeve was not a whole lot less work than making these threaded bungs. These bolted connections can now be done into a blind area where accessing the nut would be difficult.

the custom ordered 3.5" diameter aluminum driveshaft arrived while the body was at paint and could now be installed. Up until now we had only seen a PVC pipe mocked up in place.
HEADER FINAL WELDING, TRANS TUNNEL, EXHAUST
The headers needed a little final welding so the ends were capped, the interior was flooded with an insert gas (Argon) and Ryan TIG welded all the remaining joints. The headers were then installed onto the engine

Another batch of parts the customer supplied included the Aviad external, belt driven oil pump, which came with some bracket parts and pulleys to fit an LS3. With the now narrower frame encroaching on that space it needed to be re-mounted so the adjustable bracket turn buckle was machined and built to tuck the pump in between the frame rail and block.

With the transmission and driveshaft in place, now it was time to start building the inner transmission tunnel. Due to the very low ride height and flat bottom undertray design planned, we routed the exhaust up inside the transmission tunnel next to the driveshaft.

This seems like a controversial part of this build, but we have a plan, and we do this all the time on cars like BMWs. The E36 M3 above has dual 3" exhaust into a 4" oval exhaust, up in the tunnel, and the E46 M3 on the right has dual 2.5" into a 3.5", also above the bottom of the floor. This is one of the reasons we elected not to use a carbon fiber driveshaft on the 69 Camaro. The yokes are always bonded to the CF tube and exhaust heat could be an issue there.

The partial tunnel structure shown is made from tubular steel and will later be skinned in aluminum. It will be a bit taller than stock but no taller than some more modern chassis we work with. This tunnel structure gives room to stuff the twin 3" exhaust pipes above the bottom of the floor. And before the arm chair quarterbacks chime in - the tunnel will have ample insulation to the driver/passenger, to keep exhaust heat at bay. All of this is being done to make the bottom of this car truly flat. The payoff will be worth the effort.

Magnaflow stepped up with a sponsorship for this build, without much prompting, and supplied the various tubing, bends and mufflers.

The Long shifter assembly was modified and installed, then the shift handle and shifter assembly were mocked up on top of the tunnel structure. Ryan then quickly built the driver's side collector extension around the shift rods and added a 3" V-band connector. Then he built the passenger side collector extension and V-band, with some bends and turns to get that side of the exhaust to "crossover" to the driver's side of the tunnel - which has more room.

Back to the driver's side now, where the exhaust is routed under the arch on the transmission tunnel, then turns up. At right you can see Ryan welding up a lot of bends...